SCH Number 2018032011


Project Info

Title
Central Amador Water Project Pioneer Water Rehabilitation Project
Description
The proposed project would include paralleling the existing pipeline in Buckhorn Ridge Rd between Deadwood Court and Elkhorn Court. The current pipeline causes a severe distribution system bottleneck that inhibits downstream flow. Specifically, the proposed project consists of the installation of approx. 6,700 ft of new 12 in pipeline extending from the north Cedar Heights PRV station in Buckhorn Ridge Rd at Cedar Heights Dr to Elkhorn Court at Tank A. The new pipeline will provide increased capacity from Buckhorn Ridge Rd to Tank C, increased capacity at tank C, and increased capacity downstream. This ensures that Tank C will be able to re-fill properly during peak usage and fire flow events. The portion of Phase 2 extending from Tank C to the intersection of Buckhorn Ridge Road and Cedar Heights Dr. was included in Environmental documentation for Phase 1 of the overall project and is not included as part of this evaluation. The portion of Phase 2 included in this evaluation would begin at the intersection of Buckhorn Ridge Road and Cedar Heights Drive and extend east to Prospect Place. Then it would continue north on Prospect Place to northeast on Oxbow Road, north on Deer Trail, and east on Elkhorn Court to Tank A.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Amador Water Agency (AWA) Central Amador Water Project Pioneer Water Rehabilitation Project Phase 2
Amador Water Agency (AWA) Central Amador Water Project Pioneer Water Rehabilitation Project