Central Amador Water Project Pioneer Water Rehabilitation Project Phase 2
2 Documents in Project
Summary
SCH Number
2018032011
Lead Agency
Amador Water Agency
(AWA)
Document Title
Central Amador Water Project Pioneer Water Rehabilitation Project Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2018
Document Description
The proposed project would include paralleling the existing pipeline in Buckhorn Ridge Rd between Deadwood Court and Elkhorn Court. The current pipeline causes a severe distribution system bottleneck that inhibits downstream flow. Specifically, the proposed project consists of the installation of approx. 6,700 ft of new 12 in pipeline extending from the north Cedar Heights PRV station in Buckhorn Ridge Rd at Cedar Heights Dr to Elkhorn Court at Tank A. The new pipeline will provide increased capacity from Buckhorn Ridge Rd to Tank C, increased capacity at tank C, and increased capacity downstream. This ensures that Tank C will be able to re-fill properly during peak usage and fire flow events.
The portion of Phase 2 extending from Tank C to the intersection of Buckhorn Ridge Road and Cedar Heights Dr. was included in Environmental documentation for Phase 1 of the overall project and is not included as part of this evaluation. The portion of Phase 2 included in this evaluation would begin at the intersection of Buckhorn Ridge Road and Cedar Heights Drive and extend east to Prospect Place. Then it would continue north on Prospect Place to northeast on Oxbow Road, north on Deer Trail, and east on Elkhorn Court to Tank A.
Contact Information
Name
Brandt Cook
Agency Name
Amador County Water Agency
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Amador
Cross Streets
Buckhorn Ridge Rd near N. Cedar Heights Dr to Elkhorn Court
Zip
95678
Total Acres
1.8 linear mi
State Highways
88
Railways
UPRR
Schools
Pioneer ES
Waterways
Pioneer and Sutter Crk
Other Location Info
Pioneer
Notice of Determination
Approving Agency
Amador Water Agency
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A