Central Amador Water Project Pioneer Water Rehabilitation Project

2 Documents in Project

Summary

SCH Number
2018032011
Lead Agency
Amador Water Agency (AWA)
Document Title
Central Amador Water Project Pioneer Water Rehabilitation Project
Document Type
MND - Mitigated Negative Declaration
Received
Document Description
The proposed project would include paralleling the existing pipeline in Buckhorn Ridge Rd between Deadwood Court and Elkhorn Court. The current pipeline causes a severe distribution system bottleneck that inhibits downstream flow. Specifically, the proposed project consists of the installation of approx 6,700 ft of new 12 in pipeline extending from the north Cedar Heights PRV station in Buckhorn Ridge Rd at Cedar Heights Dr to Elkhorn Court at Tank A. The new pipeline will provide increased capacity from Buckhorn Ridge Rd to Tank C, increased capacity at tank C, and increased capacity downstream. This ensures that Tank C will be able to re-fill properly during peak usage and fire flow events.

Contact Information

Name
Brandt Cook
Agency Name
Amador County Water Agency
Contact Types
Lead/Public Agency

Location

Counties
Amador
Cross Streets
Buckhorn Ridge Rd near N. Cedar Heights Dr to Elkhorn Court
Zip
95678
Total Acres
1.8 linear mi
State Highways
88
Railways
UPRR
Schools
Pioneer ES
Waterways
Pioneer and Sutter Crk
Other Location Info
Pioneer

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 10 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Divison of Financial Assistance, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Other (pipeline)
Local Actions
infrastructure
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print