SCH Number 2020060424
Project Info
- Title
- Yuba City Boat Ramp Sediment Removal Project
- Description
- The Proposed Project would include the following: maintenance dredging of the boat ramp/boat area and the confluence of the Feather River and the Yuba River; dewatering the dredged material in the existing northernmost wastewater ponds at the former Marysville Wastewater Treatment Plant (WWTP) proposed by the City of Marysville for decommissioning; and disposal of the dredged material. Phase 1 of the Project would involve removal of the originally planned 65,600 cy, and Phase 2 of the Project would involve the additional 250,000 cy if additional funding becomes available, for a total of 315,600 cy. The Project would occur between 2021 and 2023, starting in June 2021.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Sutter Butte Flood Control Agency (SBFCA) | Yuba City Boat Ram[ Sediment Removal Project | |
EIR | Sutter Butte Flood Control Agency (SBFCA) | Yuba City Boat Ramp Sediment Removal Project | |
NOP | Sutter Butte Flood Control Agency (SBFCA) | Yuba City Boat Ramp Sediment Removal Project |