SCH Number 2019109100


Project Info

Title
Karnak Pump Station Erosion Repair and Debris Screen Retrofit Project
Description
.The Proposed Project consists of: (1) installing approximately 320-feet of new sheet pile wall along the south bank of the canal to remediate the erosion of the canal bank; (2) placement of approximately 500 tons of drainrock and approximately 130 cubic yards of topsoil backfill behind the sheet pile wall; (3) removal and replacement of approximately 350-feet of existing chain-link fence; (4) installation of 9 new 10-foot wide automatic conveyor-belt style debris removal screens to replace the existing debris catchment system; and (5) implementation of seeding and erosion control measures
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Reclamation District 1500 Karnak Pump Station Erosion Repair and Debris Screen Retrofit
Reclamation District 1500 Final Initial Study/Mitigated Negative Declaration for the Karnak Pump Station Erosion Repair and Debris Screen Retrofit Project (Proposed Project)
Reclamation District 1500 Karnak Pump Station Erosion Repair and Debris Screen Retrofit Project