SCH Number 2019090216


Project Info

Title
El Dorado to Clinton Rehab
Description
California Department of Transportation (Caltrans) proposes to rehabilitate about 3.2 miles on State Route (SR) 99 from Post Mile (PM) 21 .2 to PM 24.4. The project proposes two alternatives that would either construct a diverging diamond interchange or two roundabouts at the Olive Avenue interchange. Each alternative proposes to retain or remove the on and off ramps at the McKinley Avenue interchange. Both include the following features: remove and construct six 12-foot lanes with continuously reinforced concrete pavement, construct a 46-foot paved median and 10-foot outside shoulders, remove the on and off ramps at the Belmont Avenue interchange, upgrade the vertical clearances under each bridge to standard, replace all the overcrossings and underpasses within the project limits except one overcrossing, remove the Pacific Avenue overcrossing, re-align Parkway Drive as frontage road, widen the bridge deck at two bridges, add auxiliary lanes, construct retaining and soundwalls at various locations, and upgrade the existing electrical elements.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
California Department of Transportation, District 6 (DOT) El Dorado to Clinton Rehab Geotech Drilling
California Department of Transportation, District 6 El Dorado to Clinton Rehab