El Dorado to Clinton Rehab Geotech Drilling

2 Documents in Project

Summary

SCH Number
2019090216
Public Agency
California Department of Transportation, District 6 (DOT)
Document Title
El Dorado to Clinton Rehab Geotech Drilling
Document Type
NOE - Notice of Exemption
Received
Posted
11/25/2020
Present Land Use
Industrial and Commercial; Residential and Industrial
Document Description
This project proposes to rehabilitate State Route 99 from postmile 21.1 to 24.4. The project includes construction of retaining walls, replacing sound walls, widening, removing and/or replacing structures within the project limits, construction of auxiliary lanes and 46-foot paved median. The Office of Geotechnical Design-North is planning to drill up to 36 borings as part of a subsurface exploration program to characterize the foundation materials at the proposed wall and bridge locations.

Contact Information

Name
Trais Norris
Agency Name
Caltrans
Contact Types
Lead/Public Agency

Name
Agency Name
Gabriella Bedrossian
Contact Types
Project Applicant

Location

Cities
Fresno
Counties
Fresno
Regions
Citywide, Countywide
Cross Streets
0.2 mile south of the El Dorado overcrossing to the Clinton Avenue overcrossing
State Highways
State Route 99
Railways
2
Airports
1
Schools
5
Other Information
Airport: Fresno Chandler Executive Airport

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Information Collection Class 6
Reasons for Exemption
The proposed work will not have a significant effect on the environment.
Download CSV New Search Print