SCH Number 2018052025
Project Info
- Title
- Uvas Creek Levee Rehabilitation Project
- Description
- Project would consist of inboard and outboard side slope reconstruction along approx. 4,200 linear feet of the levee. An additional 350 linear feet of reconstruction would occur to the outboard embankment. The levee side slope reconstruction would first require knowing the existing grasses to reduce the organic content followed by excavation and benching of the levee. Upon completion of the excavation activities, rebuilding the levee would consist of placing the excavated material in compacted layers. Erosion control matting would be embedded within the rebuilt levee slope and covered with additional fill material until as-built grades are achieved. The rebuilt levee surface would be hydroseeded with a native seed to promote the establishment of grasses. Resurfacing of the existing asphalt pedestrian trail and maintenance road atop the levee would be undertaken to repair damage, if any, from construction equipment.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Santa Clara Valley Water District | Uvas Creek Levee Rehabilitation Project (Lake or Streambed Alteration Agreement No. 1600-2018- 0390-R3) | |
NOD | Santa Clara Valley Water District | Uvas Creek Levee Rehabilitation Project | |
NEG | Santa Clara Valley Water District | Uvas Creek Levee Rehabilitation Project |