- Title
- Anaheim South Recycled Water Project
- Description
- The project will install the recycled water supply and metering connection, a recycled water pump station with a tank, and distribution pipelines serving the southern area of Anaheim. Near Rampart Street, the project will construct a new turnout facility on the 66-inch diameter Groundwater Replenishment System pipeline. A new recycled water pump station will be located after immediately adjacent to the GWRS connection. An approx. 50,000 gallon recycled water fore bay/storage tank is planned to be constructed with the recycled water pump station to reduce peak flow effects to the GWRS. Total pipeline installation includes 42,300 linear feet; exclusive of Alternative A is an alternative to installation along Orangewood Avenue from I-5 Freeway to Harbor Blvd. Lateral connections will be made at various locations along the distribution system to connect customer meters.
3 documents in project