SCH Number 2014042039


Project Info

Title
San Jose/Santa Clara Regional Wastewater Facility Cogeneration Project - Boilers and Chillers Replacement
Description
The project would include the installation of up to 4 natural gas/bio gas fired reciprocating engines ( up to 12.5 MW total for three of the four operating at any one time) at the San Jose/ Santa Clara Regional Wastewater Facility. The proposed engines would meet or exceed Achieved in Practice emissions standards maintained by the Bay Area Air Quality Management District (BAAQMD). The proposed engines would be housed in a new 36,300 sq. ft. (330 feet x 110 feet) Cogeneration Building that would be constructed within the Facility operational boundary near Zanker Road. The Cogeneration Building would be constructed as a high-bay concrete design, with a height similar to the existing Blower General Building. The proposed Cogeneration Building would also include 4 new stacks for air emissions. The stacks would be 24 inches in diameter and would reach approx. 40 feet in height, which is the same height as the existing stack for the adjacent Blower Generation Building.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
City of San Jose PP16-009 San Jose/Santa Clara Regional Wastewater Facility Cogeneration Project - Boilers and Chillers Replacement
City of San Jose San Jose/Santa Clara Regional Wastewater Facility Cogeneration Project - Boilers and Chillers Replacement
City of San Jose PP14-005
City of San Jose San Jose / Santa Clara Regional Wastewater Facility Cogeneration Project