- Well V817 Rose Valley Pipeline Installation Project
- Description
- The Well V817 Rose Valley Pipeline Installation Project consists of the installation of an eight-inch polyvinyl chloride (PVC) pipe, approximately 1,500 ft in length, and associated pumping equipment from Well V817 to the First Los Angeles Aqueduct. The project will involve a six month pumping test of Well V817 at a rate of 1.25 cubic ft per second to collect data to improve the estimate of water seepage from Haiwee Reservoir and determine the long-term effects of pumping water from Well V817.
2 documents in project