SCH Number 2013051064
Project Info
- Title
- Nitrate Exceedance - Remediation/Water Supply Project
- Description
- Note: Addendum and Review Per Lead The purpose of the project is to replace the existing booster pump station electrical panels. The replacement tank and electrical will be constructed on the same site as the existing and will be in the exact same location. The proposed project will have substantially the same purpose and capacity as the structure being replaced. The new tank will an AWWA D103 steel bolted storage tank, 38-ft diameter by 24-ft tall, on a gravel ring foundation in the same location as the existing tank. The electrical panels for two 25 hp booster pumps will be replaced with two 25 hp variable speed drives.
4 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
ADM | Ducor Community Services District | Nitrate Exceedance - Remediation/Water Supply Project | |
NOD | Ducor Community Services District | Ducor Nitrate Exceedence - Remediation/Water Supply Project | |
NOD | Ducor Community Services District | Ducor Nitrate Exceedence - Remediation/Water Supply Project | |
MND | Ducor Community Services District | Ducor Nitrate Exceedence - Remediation/Water Supply Project |