Ducor Nitrate Exceedence - Remediation/Water Supply Project
4 Documents in Project
Summary
SCH Number
2013051064
Lead Agency
Ducor Community Services District
Document Title
Ducor Nitrate Exceedence - Remediation/Water Supply Project
Document Type
NOD - Notice of Determination
Received
Posted
6/4/2015
Present Land Use
The Project area is within the Ducor Urban Development Boundary and subject to the Terra Bella/Ducor Community Plan, the future use of the new well site is Public/Quasi-Public. Z: A-1, AE-40, R-A, R-A-M, R-1, R-2, R-3, R-3-M, C-2, C-2-SR, M-1, M-2, MH
Document Description
The State Water Resources Control Board (SWRCB) is a responsible agency for this project. The Department's Safe Drinking Water Proposition 84 Program is providing state funds for the project. The Ducor Community Services District proposes to install a new water supply well (Well No. 6) in the northeast area of the community. The construction project will include development of a pilot hole, production testing, well video inspection, water quality analysis, the installation of pump and motor as well as constructing the well facility with discharge piping and electrical. The well pump and motor will be housed in an insulated 10 by 10 foot enclosure with steel siding and roofing. The new well facility includes a 3,000 gallon hydropneumatic tank, discharging piping, valves, and appurtenances, and a chlorine injection system. The project includes approximately 1,500 feet of 8-inch PVC transmission pipeline to be installed connecting the well water to the existing South Well No. 4 storage tank. The project also includes abandoning North Wells 3 and 4.
Contact Information
Name
Carol Atkins
Agency Name
State Water Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Tulare
Cross Streets
Ave 56 & Carlisle Road
Zip
93218
Total Acres
2
Parcel #
321-080-075
State Highways
Hwy 65
Railways
UPRR
Airports
No
Schools
Ducor ES
Waterways
White River
Township
23S
Range
23E
Section
27/34
Base
MDB&M
Other Location Info
Ducor
Notice of Determination
Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.