SCH Number 2009081079
Project Info
- Title
- Pier B On-Dock Rail Support Facility
- Description
- Project would reconfigure, expand, and enhance the existing rail support facility located at Pier B in the Port of Long Beach to provide for additional railcar storage and staging capacity, including 36 additional rail tracks for railcar repair, and fueling, and to accommodate for assembly of cargo trains up to 10,000 feet long. The project would require realignment of Pier B Street, closure of the existing 9th Street grade crossing and certain local streets, and removal of existing ramps to and from the Shoemaker Bridge to provide sufficient area for expansion of the on-dock rail support facility. Utility lines would be newly constructed or relocated into subsurface utility corridors located between tracks.
5 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Port of Long Beach | Final Environmental Impact Report for the Pier B On-Dock Rail SUpport Facility Project; Harbor Development Permit No. 07-021 | |
NOD | Port of Long Beach | Pier B On-Dock Rail Support Facility Project; Harbor Development Permit No. 07-021 | |
FIN | Port of Long Beach | Pier B On-Dock Rail Support Facility | |
EIR | Port of Long Beach | Pier B On-Dock Rail Support Facility | |
NOP | Port of Long Beach | Port of Long Beach On-Dock Rail Support Facility |