SCH Number 2005012126
Project Info
- Title
- Highway 1 Bridge Replacement Project
- Description
- The project will replace the existing bridge with a 63-foot wide by 140-foot long structure consisting of two 12-foot lanes, two 8-foot wide shoulders and a 12-foot wide separated pedestrian/Class l Bicycle path, rebuild a 990-foot long section of roadway at the southern end of the bridge, and a 570-foot long section of roadway at the northern end of the bridge, and widen the San Pedro Creek channel tor provide flood capacity.
3 documents in project