SCH Number 2002011094


Project Info

Title
Notice of Preparation of a Subsequent Environmental Impact Report for the Matilija Dam Ecosystem Restoration Project
Description
In October 2000, VCPWA – WP, then the Ventura County Flood Control District, initiated the Matilija Dam Ecosystem Restoration Study as a joint effort between Watershed Protection and U.S. Army Corps of Engineers to develop a project resulting in the removal of Matilija Dam. The primary Project objectives included: aquatic and terrestrial habitat improvement, facilitating the return of a viable and abundant run of steelhead trout; and restoration of natural sediment transport processes along Matilija Creek and the Ventura River. The secondary objective was enhancement of recreational opportunities along these two waterways. The joint Environmental Impact Statement/Environmental Impact Report (EIS/EIR) certified in 2004 evaluated alternatives combining dam removal, sediment relocation, flood protection (levees), two bridge replacements, new recreation features, giant reed removal, and water supply improvements. Technical studies to refine project features continued between 2008 and 2016, resulting in a new dam removal method and reevaluation of other project components. In June 2017, VCPWA – WP received funding to implement the Matilija Dam Removal 65% Design Planning Project, comprising additional technical studies, construction design, and CEQA analyses. The VCPWA – WP has determined that preparation of a Subsequent EIR is warranted to provide a complete and objective analysis of the revised Project components developed to date.
Download CSV New Search

 

11 documents in project

Type Lead/Public Agency Received Title
Ventura County Watershed Protection District Notice of Preparation of a Subsequent Environmental Impact Report for the Matilija Dam Ecosystem Restoration Project
Ventura County Matilija Dam Ecosystem Restoration Feasibility Study FEIS/EIR (Lake or Streambed Alteration Agreement No. 1600-2020-0019-R5)
Ventura County Approval of Minor Changes to, and Design Details for, the Santa Ana Boulevard Bridge Replacement Component of the previously Matilija Dam Ecosystem Restoration
Ventura County Watershed Protection District Ventura River Watershed Giant Reed Removal (Streambed Alteration Agreement No. 1600-2017-0064-R5 (SAA))
Ventura County Watershed Protection District Ventura River Invasive Plant Removal and Ecosystem Restoration Project
Ventura County Watershed Protection District Matilija Dam Ecosystem Restoration Feasibility Study/Restoration Project
Ventura County Watershed Protection District EIS/EIR for the Matilija Dam Ecosystem Restoration Project Feasibility Study
Ventura County Watershed Protection District EIS/EIR for the Matilija Dam Ecosystem Restoration Project Feasibility Study
Ventura County Watershed Protection District Matilija Dam Ecosystem Restoration Project
Ventura County Watershed Protection District Matilija Dam Ecosystem Restoration Project
Ventura County Watershed Protection District EIS/EIR for the Matilija Dam Ecosystem Restoration Project Feasibility Study