EIS/EIR for the Matilija Dam Ecosystem Restoration Project Feasibility Study

11 Documents in Project

Summary

SCH Number
2002011094
Lead Agency
Ventura County Watershed Protection District
Document Title
EIS/EIR for the Matilija Dam Ecosystem Restoration Project Feasibility Study
Document Type
NOD - Notice of Determination
Received
Posted
12/21/2004
Present Land Use
Various land designations in Ventura County and the cities of Ojai, San Buenaventura, and the Los Padres National Forest.
Document Description
The Matilija Dam Ecosystem Restoration Feasibility Study identifies project components that, when implemented, would result in benefits to native fish and wildlife, improve the natural hydrological and sedimentation regime to support coastal beach sand replenishment, and provide for additional recreation opportunities. The proposed Matilija Dam Ecosystem Restoration Project activities include removal of Matilija Dam, restoration of a stream channel through the captured sediments behind the dam, temporary stabilization of these sediments, flood control levees/floodwalls; bridge replacements, recreation facility development, modification to Robles Diversion facilities, exotic plant control, and other project components.

Contact Information

Name
Jeff Pratt
Agency Name
Ventura County Watershed Protection District
Contact Types
Lead/Public Agency

Location

Cities
Ojai, Ventura
Counties
Ventura
Total Acres
~ 2,000
State Highways
SR 33, SR 150
Waterways
Matilija Creek, Ventura River
Other Location Info
Ventura River

Notice of Determination

Approving Agency
Ventura County Watershed Protection District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print