Scale Road Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2014-0285-R2)

2 Documents in Project

Summary

SCH Number
2014092053
Lead Agency
Yuba County
Document Title
Scale Road Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2014-0285-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/9/2015
Present Land Use
Existing Bridge; A/RR; Natural Resources
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2014-0285-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Yuba County Department of Public Works. The project is limited to the construction of a replacement bridge on Scales Road crossing Slate Creek. The existing bridge will remain in place. The new bridge will be constructed approximately 40-feet southeast of the existing bridge edge. The span of the new bridge will be approximately 148-feet long and 22-feet wide. The approach roadway will be improved and widened up to 400-feet on both sides of the bridge. The realigned roadway will accommodate two 9-foot wide travel lanes and two 2-foot wide shoulders. The construction design will require flared retaining walls and wider than needed bridge widths up to 40-feet wide at both ends of the bridge. A temporary concrete batch plant will be located upstream of the bridge outside of the riparian area. The project will include permanent impacts to 30-linear feet of Mixed Conifer Hardwood Forest Riparian.

Contact Information

Name
Tanya Sheya
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency

Location

Counties
Plumas
Cross Streets
3.0 miles east of La Porte Road & Scales Road Intersection
Zip
95981
Waterways
Slate Creek
Other Location Info
Strawberry

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print