James and Katherin Burney Use Permit and Reclamation Plan (UP-09-07/RP-09-02)
2 Documents in Project
Summary
SCH Number
2009082068
Lead Agency
Siskiyou County
Document Title
James and Katherin Burney Use Permit and Reclamation Plan (UP-09-07/RP-09-02)
Document Type
NOD - Notice of Determination
Received
Posted
12/9/2009
Document Description
Use Permit and Reclamation Plan approval for an open-pit quarry located on a 168 acre parcel. 360,000 cy of volcanic rock (primarily basalt) are planned to be harvested over a 20 yr mine life. Annual production is estimated at 20,000-10,000 cy, as demand requires. Quarry activities would be concentrated within 9 acres located on the northwestern slope of a hilltop 2,595 ft above sea level, ~300 ft above roadway grade, and ~1,400 ft north of Copco Road.
At the conclusion of mining activities, the proposed quarry/processing area would be reclaimed. Reclamation would include site contouring, re-vegetation and preparation of the site as open space at the conlcusion of quarrying activities. The viable topsoil present at the proposed mine site would be removed and stored separately prior to the onset of quarry activities. Upon completion of the quarry area, surfaces would be ripped or disced to a minimum 12 inch depth or harvested unmarketable overburden would be evenly spread on the disturbed quarry floor to establish a suitable root zone. Revegetation would begin during the fall and winter season immediately following the application of topsoil to the quarry floor. The more appropriate seed type, rate of application, and use of soil amendments would be determined by the test plots conducted during quarry operations.
Contact Information
Name
Greg Plucker
Agency Name
Siskiyou County Public Health & Community Development
Contact Types
Lead/Public Agency
Phone
Location
Counties
Siskiyou
Cross Streets
North of Copco Rd 6 miles east of I-5. north of the Klamath River
Parcel #
041-070-100
Waterways
Klamath River
Township
47N
Range
5W
Section
17
Notice of Determination
Approving Agency
Siskiyou County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes