Big River Watershed Restoration - Proposition 40 River Parkways Grant Project

8 Documents in Project

Summary

SCH Number
2006072012
Lead Agency
California Department of Parks and Recreation
Document Title
Big River Watershed Restoration - Proposition 40 River Parkways Grant Project
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2006
Present Land Use
Open Space
Document Description
The proposed project would replace failing culverts at Class II and Class III stream crossings with bridges, remove accumulated sediments and road fill prisms from stream crossings, construct armored fords at Class II and Class III stream crossings, partially restore historic topography and native vegetation on former logging roads (road decommissioning), and convert roads to trails. The project will also delineate parking areas, a boat launch ramp, and driving surfaces within the existing west-end entry area to the Big River unit, accessed from State Highway 1, and construct a vault-type restroom building in the entry area outside the 100-year floodplain. Standard parks signs and a Proposition 40 acknowledgement sign will also be installed as part of the this project.

Contact Information

Name
Renee Pasquinelli
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
Mendocino
Cross Streets
SR-1 and Big River Road
Zip
95460
Total Acres
< 41
Parcel #
119-260-10, 11; 119-270-11; 119-290-04; 119-440-01; 119-480-02; 119-500-11, 12, 14, 03
State Highways
1
Airports
Little River
Schools
Mendocino Grammar and High Schools
Waterways
Pacific Ocean, Big River
Township
16,17N
Range
16,17W
Section
6, 1,
Other Location Info
City/Nearest Community: Mendocino
Other Information
Section: 31, 24, 25, 26, 28, 29, 30, 34, 35

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print