Headworks West Reservoir Project
8 Documents in Project
Summary
SCH Number
2003081133
Lead Agency
Los Angeles County
Document Title
Headworks West Reservoir Project
Document Type
NOD - Notice of Determination
Received
Posted
8/27/2018
Present Land Use
Open Space
Document Description
SWRCB is a responsible agency for this project. SWRCB Safe Drinking Water State revolving Fund Program is providing funds for the project. The LADWP proposes to construct on a 43-acre site adjacent to the Los Angeles River two buried potable water storage reservoirs (54 - million gallon storage reservoir approved previously for Headworks East, and 56-million gallon storage reservoir Headworks West) and conveyance facility that include two reservoir access appurtenant structures, connecting inlet and outlet river supply conduit, four buried vaults with valves, removal of Ivanhoe reservoir service and routing of a new conveyance pipeline to reservoir, excavate, and backfill approx. 360,000 cubic yards of soil, a total of approximately 98,686 cubic yards of concrete is required and 6 sampling hatches.
Contact Information
Name
Samantha Yu
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Los Angeles
Counties
Los Angeles
Cross Streets
Hwy 134, Forest Lawn Dr., I-5, Sunset Blvd.
Zip
90026/68
Total Acres
~ 43
State Highways
134, 2
Waterways
Los Angeles River
Notice of Determination
Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.