Bel Marin Keys Community Services District South Lagoon Levee Repair and Stormwater Improvements Project
4 Documents in Project
Summary
SCH Number
2003022071
Lead Agency
Bel Marin Keys Community Services District
(BMKCSD)
Document Title
Bel Marin Keys Community Services District South Lagoon Levee Repair and Stormwater Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2009
Document Description
NOTE: Addendum
The previously adopted MND authorized repairs to the easterly most portion of the Bel Marin Keys South Lagoon Levee, adjacent to the South Lagoon. The previous project restored the eroded sections of the levee and installed armor stone to absorb wave action to protect the slope from future erosion. The project also included the construction of an overflow structure and repairs to the levee adjacent to Bel Marin Keys Boulevard.
The proposed project includes an emergency overflow structure to maintain the water levels within the lagoon during storm events. The overflow structure shall consist of (3) 6'x4' corrugated steel overflow pipes which shall be powered for a sluice gate to control the operation of the structure.
In addiction, the project includes the replacement of the existing tide gate structure that connects the eastern moat (closest to the South Lock) to the Novato Creek. The proposed tide gate structure would replace an aged structure currently in place with a weir to control the flow. The existing pipe will be replaced with a large diameter pipe which will improve the water quality in the moat by continuous flushing, increasing the tidal flow which would in turn reduce sedimentation by the lock. The proposed tide gate would include the replacement of the sluice gate to control floowaters. As part of this project, the moat will also be "mucked out" to restoring the overall capacity.
Contact Information
Name
Wendy Pavao
Agency Name
Bel Marin Keys Community Services District
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Novato
Counties
Marin
Cross Streets
Bel Marin Key Boulevard
Zip
94949
Total Acres
~ 1.0
State Highways
37
Railways
Northwestern Pacific
Notice of Determination
Approving Agency
Bel Marin Community Services District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.