Document Description
Use Permit and Reclamation Plan to allow the development of a quarry. The primary commodity to be produced is hard rock rip-rap, and a small amount of rock and road base. The total parcel size is 80 acres. Approximately 5 acres will be disturbed for mining. The applicant is requesting a starting date of January 2002 and an ending date of August 2011. The total volume to be extracted from the site is 62,000 cubic yards (cy). 30,000 cy is expected to be drained during the first two years, and an additional 400 cy is expected to be extracted every year thereafter during mining operations. The anticipated depth of exploration is 5 feet to 30 feet below existing topography depending on location. Extraction depth is not expected to exceed the current soil surface. Proposed land use after the reclamation is home sites. Reclamation will cover approximately 5 acres. Haul roads from the mining operation are to remain after the close of operations to provide access to the home sites from Alder Point Bluffs Road.

Contact Information

Name
Tina Marie Devor
Agency Name
Trinity County Planning Department
Contact Types
Lead/Public Agency

Location

Counties
Trinity
Cross Streets
Alder Point Bluffs Road
Total Acres
80
Parcel #
020-180-25
Township
3S
Range
6E
Section
17
Base
HBM
Other Location Info
Zenia

Notice of Determination

Approving Agency
Trinity County Planning Department
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A