City of Rio Dell's Application to Appropriate Water by Permit and Petition to Change Point of Diversion
3 Documents in Project
Summary
SCH Number
2001112055
Lead Agency
City of Rio Dell
Document Title
City of Rio Dell's Application to Appropriate Water by Permit and Petition to Change Point of Diversion
Document Type
NOD - Notice of Determination
Received
Posted
12/26/2001
Document Description
The purpose of this project is for the City of Rio Dell to obtain a water right to expand the City's allowable withdrawal from the Eel River in order to meet the long-term domestic water needs of the City. The project also seeks to relocate the existing point of diversion from a location across the Eel River to a location more easily accessible and less likely to be affected in a major flood, earthquake, or other natural disaster. A water right application (No. A031164) has been filed with the State Water Resources Control Board to expand the water right. In addition, the City filed a Petition for Change to add two points of diversion to their current License 10464 (Application 23196).
Contact Information
Name
Steve McHaney
Agency Name
City of Rio Dell
Contact Types
Lead/Public Agency
Phone
Location
Cities
Rio Dell
Counties
Humboldt
Cross Streets
Edwards Street
Zip
95562
State Highways
101
Waterways
Eel River
Township
1N
Range
1E
Section
5
Notice of Determination
Approving Agency
City of Rio Dell
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.