City of Petaluma - Biomass to Biofuel (B2B) Project
6 Documents in Project
Summary
SCH Number
2001052089
Lead Agency
City of Petaluma
Document Title
City of Petaluma - Biomass to Biofuel (B2B) Project
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2016
Present Land Use
Public and Insitutional (Hooper Street site and existing Lakeville site) & Land Extensive Agriculture (Proposed Lakeville Site for Wetlands). Light Industrial (Hooper Street site) & Agriculture, Diverse Agriculture and Land Extensive Agriculture (Lakeville site)
Document Description
The city of Petaluma will upgrade its Water Recycling Facility and construct an anaerobic digestion system that produces 150,000 gasoline gallon equivalents of renewable natural gas per year from the waste of local food and beverage production and fuel waste collection vehicles. The new facilities, which located entirely on the existing asphalt in the Ellis Creek Water Recycling Facility, include an anaerobic digester and associated solid handling facilities, high strength waste facilities, Biogas conveyance pipelines, and a compressed natural gas (CNG) fueling station/
Contact Information
Name
Chi-Chung Tsao
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency
Phone
Location
Cities
Petaluma
Counties
Sonoma
Cross Streets
Lakeville Street & Hopper Street: Browns Lane & Lakeville Highway
Parcel #
007-170-016,-022, -008; 068-010-023, -024, -025, -026,
State Highways
101, 116
Railways
Northwestern Pacific
Airports
Petaluma Municipal Airport
Waterways
Petaluma River & Several Creeks
Township
5N,4N,
Range
7W,6W
Section
31,1,
Base
Mt. Diab
Other Information
TsN-R7W-S31; T4N-R7W-S1; T4N-R7W-S12; T4N-R6W-S6; T5N-R7W-34
4000 block of Lakeville Highway
Notice of Determination
Approving Agency
California Energy Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.