SCH Number 2021010106


Project Info

Title
Teviston Community Services District Water System Improvement Project
Description
The Project includes construction of the following primary features: • A new well, Well 4, including a new well pump, a water storage tank, emergency use-only generator, and interconnecting pipelines. • Conversion of existing Well 3 to “stand-by” status. • Proper abandonment of existing inactive North and South Wells. Replacement of 136 existing water meters with new. The Project proposes to drill and construct a new production well, “Well 4”, at the North Well site (APN 316-220-009), which is just off Road 132, approximately 650 feet north of the intersection of Avenue 80 and Road 132. In addition, at the Well 4 site, the following Project improvements will be included: potable water storage tank, booster pump station, hydropneumatic tank, chlorination injection ports for ongoing chlorination, electrical service upgrade, motor control center, shade structure, portable emergency use-only diesel-powered generator, and 136 1-inch water meters. Also discharge pipe improvements will be made to the existing Well 3 (APN 316-22-004) to bring it into compliance with State requirements. The inactive North and South wells will be abandoned per State and County requirements.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Teviston Community Services District Teviston Community Services District Water System Improvement Project
Teviston Community Services District Teviston Community Services District Water System Improvement Project