SCH Number 2020100225
Project Info
- Title
- Abraham Lincoln High School Comprehensive Modernization Project
- Description
- The proposed Project is designed to address the most critical physical concerns of the building and grounds at the Campus while providing renovations, modernizations, and reconfigurations. The proposed Project includes new buildings including a 2-story classroom building, performing arts building, Maintenance and Operations building, facilities for Pueblo de Los Angeles Continuation High School (modular buildings anticipated), and field house restroom building. The proposed Project also includes modernization of existing structures and site improvements including utility upgrades, access upgrades to meet programmatic requirements of the Americans with Disabilities Act, and landscape and hardscape improvements. The project includes demolition of the music building, storage building, shop building, Pueblo de Los Angeles Continuation High School (3 portable/relocatable structures), and 7 portable buildings. Pueblo de Los Angeles Continuation HS would temporarily be relocated to Glen Alta Elementary School during construction. The campus is not on any of the lists compiled under Government Code Section 65926.5.
2 documents in project