SCH Number 2020031118


Project Info

Title
66-Inch Trunk Sewer Rehabilitation Project: Kaiser Road to Soscol Water Recycling Facility (CIP 19701)
Description
The project would rehabilitated approx 6,935 linear feet of 66-inch diameter trunk sewer pipeline using a trenchless rehabilitation lining system. To conducted the sewer rehabilitation work, installation of a temporary sewer bypass system would be necessary. The temporary bypass pipelines would be installed above-ground at roadway and driveway crossings and through intersections where they would be temporarily shallow buried. There are several options for the placement of the bypass pipelines; the IS/MND evaluates the potential environmental impacts of all options, however the preferred option is Cured In Place Pipe (CIPP) using Bypass Alternative 2 for crossing of the Bedford Slough.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Napa Sanitation District 66-inch Trunk Sewer Rehabilitaiton: Kaiser Road to SWRF
Napa Sanitation District 66-Inch Trunk Sewer Rehabilitation Project: Kaiser Road to Soscol Water Recycling Facility (CIP 19701)