SCH Number 2020029015
Project Info
- Title
- Tequesquite Creek Maintenance Project
- Description
- The proposed project includes maintenance within an approximately 500-foot segment of the Tequesquite Creek Channel to maintain adequate flood capacity and prevent debris from washing downstream. Maintenance activities would be conducted within a 0.93-acre area at least once per year from 2020 through 2029 (approximately 10 years). Each maintenance event would require 1 to 3 working days to complete. Excavated material would be temporarily stockpiled in an upland location adjacent to the channel, prior to placement of the material in a dump truck for transport and off-site disposal.
2 documents in project