SCH Number 2019089053
Project Info
- Title
- Teichert Shifler Mining and Reclamation Project
- Description
- The proposed project includes mining 41.6 million tons (35.25 million tons sold) of aggregate resources (sand and gravel) over a requested 30-year period at an annual rate not to exceed 2.6 million tons mined per year (2.2 million tons sold). Mining is proposed in two phases moving from north to south, commencing with Phase A on the north. Reclamation is proposed in three phases to reclaim 117 acres of agricultural uses and provide 161 acres of pond and habitat uses. Relocation of the Moore Canal to the northerly portion of the project site is proposed. The project would also require a General Plan Amendment to extend the Mineral Resource Overlay over the entire project site and a rezone to add a Sand and Gravel Overlay (SG-O) to the existing A-N zoning.
2 documents in project