SCH Number 2019089013


Project Info

Title
Coast Pump Station Raw Water Pipeline Replacement Project
Description
The City of Santa Cruz Water Department proposes to replace approximately 525 feet of the Coast Pump Station raw water pipeline in a segment aligned under the San Lorenzo River in Santa Cruz, CA (Figure 1). This segment of the existing pipeline varies in diameter and includes portions that are both 20 and 24 inches in diameter. The replacement pipeline would have a single diameter of 24 inches. The replacement 24 inch diameter pipeline would provide a negligible increase in capacity and would connect to existing points at each end of the segment proposed for replacement. The existing pipeline would remain in use until the new pipeline segment is operational, at which point the existing pipeline segment would be capped and abandoned in place. See NOC for full details.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Santa Cruz Coast Pump Station Raw Water Pipeline Replacement (Lake or Streambed Alteration Agreement No. 1600-2019-0369-R3)
City of Santa Cruz Coast Pump Station Raw Water Pipeline Replacement Project