SCH Number 2019012051
Project Info
- Title
- Van Wycke Bicycle and Pedestrian Connectivity Project
- Description
- The Van Wycke Bicycle and Pedestrian Connectivity Project involves several improvements within the project area to improve both pedestrian and bicycle travel connectivity within the City of Trinidad. Improvements include installation of new curbs, sidewalks and crosswalks, a 5' paved bike lane in the uphill direction of Edwards Street (south side) and sharrows in the downhill direction, and construction of a 5' wide gravel pedestrian trail where the existing Van Wycke St trail is failing; repair of the trail requires construction of a new retaining wall. Other improvements include split-rail fencing, striping, detectable warning surfaces and directional and interpretive signs.
3 documents in project