SCH Number 2018111045


Project Info

Title
De Soto Trunk Line Project
Description
The proposed project would replace a portion of the existing De Soto Trunk Line and Roscoe Trunk Line. The replacement trunk lines would extend along Devonshire Street from De Soto Avenue to Mason Avenue (0.5 miles), along Mason Avenue from Devonshire Street to Roscoe Boulevard (2.6 miles), and along Roscoe Boulevard from Mason Avenue to De Soto Avenue (0.5 miles). The project would also involve trunk line replacements at the intersection of De Soto Avenue and Victory Boulevard (totaling 900 feet). The proposed project would also include installation of maintenance/access holes, isolation valves, blow-offs, air/vacuum valves, and flowmeters that are required for the operation, monitoring, and maintenance of the trunk lines. The project would increase the safety, capacity, and reliability of the City of Los Angeles potable water supply in the western San Fernando Valley area.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Los Angeles Department of Water and Power De Soto Trunk Line Project
Los Angeles Department of Water and Power De Soto Trunk Line Project
Los Angeles Department of Water and Power De Soto Trunk Line Replacement Project