SCH Number 2018082003
Project Info
- Title
- Expedited Best Available Retrofit Control Technology (BARCT) Implementation Schedule
- Description
- Assembly Bill 617 amends California Health and Safety Code section 40920.6 et seq. and requires each air district that is a nonattainment area for one or more air pollutants to adopt an expedited schedule for implementation of BARCT on specified facilities by the earliest feasible date, but no later than Dec 31, 2023. Local air districts are required to adopt this schedule before Jan 1, 2019. The Expedited BARCT Implementation Schedule includes six potential rule development projects to address emissions from: 1) organic liquid storage tanks; 2) petroleum wastewater treating; 3) Portland cement manufacturing; 4) refinery fluid catalytic crackers and CO gas boilers; 5) refinery heavy liquid leaks; and 6) petroleum coke calcining.
2 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
EIR | Bay Area Air Quality Management District (BAAQMD) | Expedited Best Available Retrofit Control Technology (BARCT) Implementation Schedule | |
NOP | Bay Area Air Quality Management District (BAAQMD) | Expedited Best Available Retrofit Control Technology (BARCT) Implementation Schedule |