SCH Number 2018062044
Project Info
- Title
- Lassen Pines Mutual Water Company Water Systems Improvement Project
- Description
- The proposed project improvements to the existing system include the construction of a 390,000 gallon water storage tank, replacement of its well and booster pumping systems, and installation of a new hydropneumatic tank and associated piping within the boundary of the existing LPMWC well and water treatment facility. LPMWC is also proposing to upgrade the existing residential distribution system through the installation of 180 new radio-read water meters equipped with an automatic meter reading system, and replacing outdated valves and piping within the Lake McCumber subdivision.
2 documents in project