SCH Number 2018062015
Project Info
- Title
- Kaiser Pond Diversion Pipe Improvement Project
- Description
- ACWD proposes to restore the hydraulic connectivity between two recharge basins, the Above Hayward Fault and the Below Hayward Fault ponds, by replacing the existing diversion pipe with a reinforced concrete box culvert and spillway. The ponds are separated by an unengineered levee that is a remnant of past quarry operations. As part of the proposed project, the district would also repair existing erosion damage on the surface of the levee resulting from the failure of the existinf diversion pipe.
2 documents in project