SCH Number 2018011039


Project Info

Title
Power Plant 1 and Power Plant 2 Transmission Line Conversion Project
Description
The Power Plant 1 and Power Plant 2 Transmission Line Conversion Project is being proposed by the LADWP and would involve the demolition of an approx 12-mile segment of an existing 115 kV transmission line, and the construction of a new 230 kV transmission line. The new transmission line would also extend approx 12 mi and would be located generally adjacent to the existing 115 kV line within an existing transmission corridor. The project would begin at the Haskell Canyon Switching Station in the north and terminate at the Sylmar Switching Station in the south. The purpose of the project is to increase the transmission capacity between HCSS and SSS so additional renewable energy supplies can be transmitted to the LA basin.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Los Angeles Department of Water and Power Power Plant 1 and Power Plant 2 Transmission Line Conversion Project
Los Angeles Department of Water and Power Power Plant 1 and Power Plant 2 Transmission Line Conversion Project
Los Angeles Department of Water and Power Power Plant 1 and Power Plant 2 Transmission Line Conversion Project