SCH Number 2016112030


Project Info

Title
Maine Prairie Water District - Ulatis Creek Pump Stations
Description
The project would construct two new pump stations:PS1, at the NW Corner of the Intersection of Highway 113 and Fry Road, and PS2 at the SE Corner of Brown Road Crossing of Ulatis Creek Project element would include: -installation and operation of ps1, a pump station with 760 sf footprint and 30 cfs conveyance capacity, discharging into an existing canal to the north, including a temporary coffer dam -installation and operation of ps2, a pump station with a 4060 sf footprint and a capacity varying up to 96 cfs, including a temporary coffer dam - installation of an initial 1.5 mile 48-inch pipeline for water conveyance from ps2 of 64 cfs -installation of a parallel 36-inch pipeline from ps2 when needed in the future with a capacity of 32 cfs. -installation and operation of fish screens at ps2 to prevent entrapment of fish - installation of power lines to supply energy to pump stations. The purpose of the Project is to enhance the District's ability to distribute water throughout the District, and to improve water delivery and access on District agricultural lands.
Download CSV New Search

 

7 documents in project

Type Lead/Public Agency Received Title
Maine Prairie Water District Maine Prairie Water District Pump Station 2 Project
Maine Prairie Water District Main Prairie Water District Pump Station 1 Project (Streambed Alteration Agreement No. 1600-2017-00144-R3)
Maine Prairie Water District Main Prairie Water District Pump Station 1 Project (Streambed Alteration Agreement No. 1600-2017-00144-R3)
Maine Prairie Water District Maine Prairie Water District Pump station Project - Pump Station 1
Maine Prairie Water District Maine Prairie Water District - Ulatis Creek Pump Stations
Maine Prairie Water District Ulatis Creek Pump Stations Project
Maine Prairie Water District Maine Prairie Water District - Ulatis Creek Pump Stations