SCH Number 2016091071


Project Info

Title
Sleepy Hollow Steelhead Rearing Facility Raw Water Intake and Water Supply System Upgrade
Description
District proposes to upgrade the Sleepy Hollow Steelhead Rearing facility to improve water supply intake reliability and intake water quality. The project includes integrating or modifying existing systems to rear juvenile steelhead to work with proposed improvements. Specific tasks include: removing an existing water intake structure in the bed of the Carmel River; installing a new intake structure and screen in the bed of the Carmel River; piping and other improvements to deliver water from the river to the facility; and constructing a recirculating aquaculture system in the floodplain adjacent to the active channel of the Carmel River to provide water clarification and filtration. Project construction is anticipated to be phased, likely beginning in early 2017 and to be completed in 2019.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
Monterey Peninsula Water Management District Addendum to Mitigated Negative Declaration for Sleepy Hollow Steelhead Rearing Facility Upgrade
Monterey Peninsula Water Management District Sleepy Hollow Steelhead Rearing Facility Raw Water Intake and Water Supply System Upgrade
Monterey Peninsula Water Management District Sleepy Hollow Steelhead Rearing Facility Raw Water Intake and Water Supply System Upgrade
Monterey Peninsula Water Management District Sleepy Hollow Steelhead Rearing Facility Raw Water Intake and Water Supply System Upgrade