SCH Number 2016032048
Project Info
- Title
- Decker Island Levee Repair Demonstration Project
- Description
- Note: 1 HC The project will repair 210 feet of eroded bank in the habitat restoration area of Decker Island, across Horseshoe Bend from the Threemile Slough Bridge. The project will compare the viability of the "gripper system" from Maverick Solutions to riprap that is traditionally used for erosion repairs in the Delta. The gripper system utilizes interlocked, non-woven geo-textile bags fill with soil and vegetation interspaced among the bags to create a highly resilient erosion control wall while providing vegetation along the channel's edge.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
FIN | California Department of Water Resources (DWR) | Decker Island Levee Repair Demonstration Project | |
NOD | California Department of Water Resources (DWR) | Decker Island Levee Repair Demonstration Project | |
MND | California Department of Water Resources (DWR) | Decker Island Levee Repair Demonstration Project |