SCH Number 2016012005


Project Info

Title
Old Sacramento Riverfront Embarcadero and K Street Barge Repair (PB15-030)
Description
The project includes two phases with the 1st phase consisting of removing & replacing the existing boardwalk decking; replacing the existing wood fascia on the floodwall; repairing the existing barge, dock, stairs, & elevator; replacing lighting with new lighting system; removing the one-story addition to the south side of the Streamers Building; adding stairs to the elevated cantilevered sections of the Embarcadero; ADA improvements to the Embarcadero; replacing railroad ties & new concrete panels installed between the ties & tracks returned to original position; replacing existing railings; & installing wood overlays on the cantilevered sections that are not on a concrete deck. The 2nd phase includes removing a pier section at the north end of the project site; installing a new maintenance platform at the CA Pacific Streamers Building; & upgrading the bike path.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
City of Sacramento Old Sacramento Riverfront Embarcadero & K Street Barge Project
City of Sacramento Old Sacramento Riverfront Embarcadero and K Street Barge Project (Phase 2) (Lake or Streambed Alteration Agreement No. 1600-2016-0270-R3)
City of Sacramento Old Sacramento Riverfront Embarcadero and K Street Barge Repair (PB15-030) - Old Sacramento Infrastructure Project
City of Sacramento Old Sacramento Riverfront Embarcadero and K Street Barge Repair (PB15-030)