SCH Number 2014121045


Project Info

Title
Distribution System Project
Description
The proposed project is the construction of new pipelines and replacement of an existing pipeline to better serve water users within the Lower Tule River Irrigation District (LTRID) service area. From east to west, the project extends approximately 12.6 miles and consists of 3 different laterals to connect to each other at all junctions. The pipeline will be buried and sections of the pipeline will stay outside of the right-of-way (ROW) of the roads. Project impacts will be temporary and constrained to a swath 20 to 30 feet wide for the entire length of the alignment. The approximate area of proposed temporary impact is 46 acres.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Lower Tule River Irrigation District Lower Tule River Irrigation District Distribution System project
Lower Tule River Irrigation District Distribution System Project