SCH Number 2014072026


Project Info

Title
Delta Coves Utility Project
Description
The main objective of the Delta Coves Utility Project, as analyzed by the MND, is to serve the future residents of Delta Coves with potable water for domestic and fire suppression purposes and natural gas from the PG&E gas pipeline. A MND was previously prepared for the Delta Coves Utility Project, and adopted on August 27, 2004 by the Board of Directors of the Diablo Water District (DWD). An Addendum to the MND has been prepared for the purpose of addressing minor changes to the original project design, which consist of refined plans for the two antenna towers located at the Chloramination Plant, and the Pump Station Site. These two antennae structures were previously identified as being "approximately 40 to 50 ft high." The necessary project design specifications have shown that these antennae structures will each be approximately 90 ft high with one containing a 3" diameter antenna extending 10 ft above the top of the structure. Pursuant to CEQA guidelines, since the revised plans do not lead directly or indirectly to significant physical changes in the project, nor do these refined plans alter the adequacy or the completeness of the environmental impacts and mitigation measures identified in the MND; no public review was necessary.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
Diablo Water District Delta Coves Utility Project, Addendum #1 to MND
Diablo Water District Delta Coves Utility Project (Lake or Streambed Alteration Agreement No. 1600-2014-0425-R3)
Diablo Water District Delta Coves Utility Project
Diablo Water District Delta Coves Utility Project