SCH Number 2014061053
Project Info
- Title
- Allan Company Material Recovery Facility
- Description
- The proposed new Material Recovery Facility (MRF) will utilize existing structures for material processing operations and storage of baled recyclables. The facility is designed for a peak throughput of 1,250 Tons per Day (TPD), but will be permitted for a maximum throughput of 1,000 TPD.
2 documents in project