SCH Number 2013092059
Project Info
- Title
- 7th Street Bridge Project
- Description
- The project proposes to upgrade or replace the current bridge to enhance seismic safety, scour safety, and live load capability; reduce future congestion; improve traffic operations; improve pedestrian/bicycle safety; and improve the local circulation system. The entire project study area includes the intersections of 7th Street with B Street/Tuolumne Boulevard north of the river, and 7th Street with Crows Landing Road south of the river.
4 documents in project