SCH Number 2013072044


Project Info

Title
Alameda to Coast Guard Island HDPE Conduit Crossing
Description
The proposed project consists of installing high density polyethylene (HDPE) conduits beneath the Oakland Estuary using Horizontal Directional Drilling (HDD) methods to drill from an entry point on CGI to an exit point across the Estuary on Alameda Island. The HDD would occur under the Estuary at a minimum depth of 60 feet below the proposed dredging limits. The directional boring would allow for the installation of a bundle of three 6-inch conduits. One conduit would house cables for the 12.47kV electrical circuit, a second conduit would be left empty for the installation of a future electrical circuit, and a third conduit would also be left empty for the installation of future communications cable(s) such as fiber optics.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Alameda County Alameda to Coast Guard Island HDPE Conduit Crossing
Alameda County Alameda to Coast Guard Island HDPE Conduit Crossing