SCH Number 2013051013
Project Info
- Title
- Dani Creek Slide Restoration Project
- Description
- Caltrans has constructed an 825-foot long soldier-pile tieback retaining wall along the outside shoulder of the southbound lane using embedded steel piles with horizontal timber lagging. An aesthetically treated barrier and bicycle railing have been constructed on top of the wall. Both the northbound and southbound lanes have been restored and reconstructed to the standard 12-foot width with four foot shoulders.
2 documents in project