SCH Number 2013041074
Project Info
- Title
- Low Water Crossing Replacement Project: 6th Place at Wildwood Creek
- Description
- The construction of the proposed project consists of elevating the existing 36-foot wide "at grade" low-water crossing of 6th Place within Wildwood Creek to construct a bridge/box culvert in order to eliminate the existing low-water crossing and alleviate current flooding deficiencies. The total length of the proposed channel improvements will extend a total of ~300 lineal feet along the existing channel alignment. The total length of the resulting street improvements will be 500 feet along the current alignment of 6th Place.
2 documents in project