SCH Number 2012121035


Project Info

Title
Syphon Reservoir Interim Facilities Project
Description
The IRWD is proposing the construction of interim facilities at the base of the Syphon Reservoir to allow IRWD to operate the reservoir for recycled water use. The proposed facilities include a covered and fenced concrete approximately 3,600-sf pad housing chlorination equipment, bulk hypochlorite storage, and metering pumps; mechanical strainers; a backwash water supply pump and lift station; air compressor and piping for the temporary reservoir aeration system; and backwash force main and drainage facilities to connect to a new 48-inch storm drain pipe. Other proposed facilities are an electrical line and transformer, an approximately 15-foot-wide gravel access road, a domestic water pipeline, emergency drain, recycled water line and storm drain.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Irvine Ranch Water District Syphon Reservoir Interim Facilities Project
Irvine Ranch Water District Syphon Reservoir Interim Facilities Project