SCH Number 2011082004
Project Info
- Title
- Asti Bank Stabilization and Fish Habitat Enhancement Project
- Description
- Lay back the vertical, destabilized sections of river bank in the section of the banks above and below the ordinary high water mark at a 2.5 to 1 slope, to install live-willow brush mattresses on the laid-back banks, excavate lateral trenches perpendicular to river low and embed rock baffles every 38 feet within the willow mattresses, and to excavate a toe trench in-water to be back filled with large rock at the foot of the willow mattresses. Incorporate and secure trees which have previously fallen into the river and created complex habitat along the shoreline at the base of the vertical banks. Boulder wing-wall current deflectors, sprigged with willow stakes, at the upstream end of the action areas. Gravel obtained from the west bank, on the property, will be placed around the cover the live-willow brush mattresses, providing the willows a rooting medium.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Sotoyome Resource Conservation District | Asti Bank Stabilization and Fish Habitat Enhancement Project | |
NOD | Sotoyome Resource Conservation District | Asti Bank Stabilization and Fish Habitat Enhancement Project | |
NEG | Sotoyome Resource Conservation District | Asti Bank Stabilization and Fish Habitat Enhancement Project |